Gaia symbolizes the Earth, nature.

Our motivation for growing comes exactly from this infinite and wise force, of which humanity is part. Irani’s robust expansion plan, with projects developed between 2020 and 2024, is guided by our deep commitment to sustainable development in its three spheres: economic, social and environmental.

Gaia Platform
Impacts

0 %
increase on cellulose production

with Gaia I.

0 %
increase on the production

of corrugated cardboard, cardboard sheets, regular slotted and die cut containers with Gaia II.

0 %
increase

of in-house power generation with Gaia I.

0 %
increase

of average power generation with Gaia IV.

0 %
increase

of average power generation with Gaia V.

Gaia Platform
Impacts

PRODUCTIVE CAPACITY

0 %
increase

on cellulose production with Gaia I.

0 %
increase on the production

of corrugated cardboard, cardboard sheets,
regular slotted and die cutcontainers with Gaia II.

POWER GENERATION

0 %
increase

of in-house power generation with Gaia I.

0 %
increase

of average power generation with Gaia IV.

0 %
increase

of average power generation with Gaia V.

The 1st Cycle investments in the Gaia Platform take place at the site of Campina da Alegria in Vargem Bonita (SC), in the Paper and Packaging plants, encompassing the following products:

  • Corrugated cardboard bag boxes and cut and crease boxes.
  • Packaging paper.
  • Corrugated cardboard sheets.

The 2nd Cycle investments take place at the sites of Campina da Alegria (SC) and Indaiatuba (SP).

Kraft packaging paper

Kraft food contact paper

Kraft tote bags for physical and online retail

Kraft paper bags for delivery and takeaway

Corrugated cardboard for packaging

Corrugated cardboard sheets

Bag boxes

Cut and crease boxes

The 1st Cycle investments in the Gaia Platform take place at the site of Campina da Alegria in Vargem Bonita (SC), in the Paper and Packaging plants, encompassing the following products:

Regular slotted and die cut corrugated containers

Packaging paper

Corrugated cardboard sheets

The 2nd Cycle investments take place at the sites of Campina da Alegria (SC) and Indaiatuba (SP).

Kraft packaging paper

Kraft food contact paper

Kraft tote bags for physical and online retail

Kraft paper bags for delivery and takeaway

Corrugated cardboard for packaging

Corrugated cardboard sheets

Bag boxes

Cut and crease boxes

Gaia Plataform

Estimated investment

UnitPaper SC Campina da AlegriaPaper SC Campina da AlegriaPaper SC Campina da AlegriaPaper SC Campina da AlegriaPackaging SC Campina da AlegriaTotal494,849 K581,309 K118,189 K150,433 K44,556 K57,613 K--28,318 K31,300 K--58,855 K62,864 K883,519 K744,767 KEstimated investment (Gross)Estimated investment (Net)Estimated investment (1T22)Investment made(done until 03/31/22)Gaia I -Gaia II - Gaia III - MP#2 ReformGaia IV - Cristo Rei RepoweringGaia V - São Luiz RepoweringChemical and UtilitiesRecovery ExpansionExpansion of SCPackaging UnitGaia Plataform1st Cycle280,640 K74,896 K16,665 K400,355 K94,718 K100,716 K18,999 K3,157 K

The estimated investment value was updated as a result of the increase in the prices of civil construction products, such as steel and copper, and also of labor, an impact that has been occurring in the market due to the pandemic, in addition to the change in scope to replace caster and wrapping machine by new machines of greater capacity. As a result, the total investment value of Plataforma Gaia increased from R$ 743,059 thousand to R$ 883,519 thousand.

Gaia VI - Paper SC Campinada AlegriaGaia VII - ETP Phase 1 ExpansionProcess Information Management SystemGaia VIII - New Cut and Crease PrinterPaper SC Campinada AlegriaIntermediate Inventory AutomationPackaging SPIndaiatuba4,330 K14.400 K14.400 K5,173 K20,917 K97.521 K103.326 K22,886 K15,034 K-2,938 K21,318 K29,897 K1,934 K1,934 K42,860 KPackaging SPIndaiatubaUnitGaia Plataform2nd CycleGaia IX -Estimated investment (Gross)Estimated investment (Net)Estimated investment (1T22)Investment made(done until 03/31/22)Total92,237 K70,178 K4,990 K2,046 K

Timeline

20202021202220232024Gaia Plataform1st CycleGaia Plataform2nd CycleGaia I -Gaia II - Gaia III - MP#2 ReformGaia IV - Cristo Rei RepoweringGaia V - São Luiz RepoweringChemical and UtilitiesRecovery ExpansionExpansion of SCPackaging UnitGaia VI - Gaia VII - ETP Phase 1 ExpansionProcess Information Management SystemGaia VIII - New Cut and Crease PrinterGaia IX - Intermediate Inventory Automation1st sem2nd sem1st sem2nd sem1st sem2nd sem1st sem2nd sem1st sem2nd semTerm (Plan)

After the completion of the basic engineering, the Project Gaia III schedule had its startup date updated as well as the performance period. The schedule that foresees the beginning of the Gaia IV and V Project was updated due to the term of the environmental licenses.

Physical progress

42%5%26,8%10%31,5%88,7%68%Basic engineering100%100%100%100%100%Physical executionGaia Plataform1st CycleGaia I - Chemical and Utilities Recovery ExpansionGaia II - Expansion of SC Packaging UnitGaia III - MP#2 ReformGaia IV - Cristo Rei RepoweringGaia V - São Luiz RepoweringN/A100%N/AN/ABasic engineeringPhysical executionGaia Plataform2nd CycleGaia VI - Gaia VII - ETP Phase 1 ExpansionProcess Information Management SystemGaia VIII - New Cut and Crease PrinterGaia IX - Intermediate Inventory Automation
Atendimento online