Gaia IV
Cristo Rei Repowering

Gaia IV project is an important step for us to become self-sustainable in renewable energy. With Cristo Rei hydro power plant repowering, at the Paper Unit, we will make a significant leap towards energy sufficiency, with an increase of 2.55MW to 6.00 MW installed power at the power plant.

Modernization

  • Frequency change from 50 Hz to 60 Hz
  • New transmission line
  • New generation and turbines
  • Infrastructure improvements

Impacts

Power generation
0 %
increase of power plant average generation
0 %
increase in global power average generation

Impacts

Power generation
0 %
increase of power plant average generation
0 %
increase in global power average generation

Investment

Gaia project ongoing expansion has the following expectations:

Estimated investment

R$ 31,299 K

Work execution planned term

18 months

Delivery milestones

Progress

60%

Follow up the project stage macro progress and the expected delivery dates.

20222023StartupStartup (Plan)Delivery milestonesEnvironmental LicensingIntegrated Environmental StudiesIrani River BasinEngineering and Physical worls1st sem1st sem2nd sem2nd sem
20222023Startup (Plan)Delivery milestonesEnvironmental LicensingIntegrated Environmental StudiesIrani River BasinEngineering and Physical worlsStartup1st sem1st sem2nd sem2nd sem

Ongoing activities

Documents

If you want more details about the Gaia IV project, you can access them through reports and documents. Just download to access the material available.

– RELATÓRIO DE STATUS – GAIA IV Acompanhe as etapas executadas até o momento, as etapas em andamento, os pontos de atenção e oportunidades.
Atendimento online