Paper SC Campina da Alegria

Expansion

  • A new wood yard
  • Recovery boiler Installation
  • New power cogeneration system
  • Interface improvement throughout this system
  • Evaporation and Non Condensable Gas (GNC) treatment expansion

Impacts

Production capacity
increase in brown Kraft cellulose production
0 %
Power generation
increase of own power generation
0 %

Impacts

Production capacity
increase in brown Kraft cellulose production
0 %
Power generation
increase of own power generation
0 %

Investment

Gaia I project ongoing expansion has the following expectations:

Estimated investment

R$ 682,023 K

Planned work execution term

30 months

Investment made (until 09/30/24)

R$ 656,848 K

Image Gallery

Follow the progress of the project

Gaia I diagram

Block diagram shows the areas to be affected and the equipment to be installed with the project.

Delivery milestones

Progress

100%

Follow up the project stage macro progress and the expected delivery dates.

2020Delivery milestones1st2nd3rd4th1st2nd3rd4th1st2nd3rd4th1st2nd3rd4th202120222023Basic Engineering (FEL 3)Infrastructure preparationRecovery BoilerCogenerationNew Wood YardNew ETA and ETACImprovements in the Firing, Washing and Caustification Areas Heat Recovery, GNC’S andEvaporation Recovery QuarterQuarterQuarterQuarterStartupDeadline (Plan)

Ongoing activities

Project is under full development and until 26.02.21, the following stages were completed:

Documents

An expansion project of this size includes a large set of implementation and development stages. You can follow them through reports and documents. Just download to access the material available.

– RELATÓRIO DE STATUS – GAIA I
Acompanhe as etapas executadas até o momento, as etapas em andamento, os pontos de atenção e oportunidades.

– DIAGRAMA PROJETO GAIA
O projeto Gaia irá gerar um impacto positivo na melhoria dos processos e aumentar a recuperação de químicos. Baixe o diagrama e entenda como funcionará esse novo fluxo.